£4.0M awarded to Eta Projects Limited by Guy's and St Thomas' NHS Foundation Trust on 1 November 2025. Co-occurrence with donors or interests elsewhere on this site is a fact from public records, not an allegation.
Substation 9 LV Panel & Generator Replacement and Evelina Standby Power
£4.0M
Contract value
Department
Guy's and St Thomas' NHS Foundation Trust
Supplier
Eta Projects Limited
Awarded
1 November 2025
Currency
GBP
Tender ID
CF-3638000D0O000000rwimUAA
Release ID
44297a7a-b59d-4ddf-b493-cc3cfc888b8d-909304
Description
The Trust has a requirement for the replacement of Electrical Substation 9 and an upgrade to the Evelina standby power system. The objective of the project is to remove the obsolescence risk for the existing LV electrical switch panels, and interlinked stand-by generators to meet the requirements of the existing electrical services. This requirement needs to be delivered to allow for the expansion for the 'Evelina PTC' and the additional power requirements and system resilience that this proj
Other contracts with Eta Projects Limited
Utility Infrastructure for the St Thomas' Power Upgrade
Guy's and St Thomas' NHS Foundation Trust · 01/11/2025
Electrical Consultant for Substations 7 and 8
Guy's and St Thomas' NHS Foundation Trust · 01/02/2022
Construction Consultancy - Mechanical & Engineering
Sussex Partnership NHS Foundation Trust · 28/07/2026
Authorising Engineer - Water
Lewisham and Greenwich NHS Trust · 01/11/2025
Authorising Engineer (AE) - Lifts
Lincolnshire Partnership NHS Foundation Trust · 01/05/2026
WHTH - Emergency high-voltage electrical infrastructure support
West Hertfordshire Teaching Hospital NHS Trust · 20/04/2026